Asynchronous Brushless motors removal: remove the motor, you must remove the motor and the external electrical connection of the connection, and make the phase tag.Removal steps: a:pulley or coupling; b:front bearing cover; c:front cover; d:hood e, fan; f, after the bearing cover; g: after cover; h: out of the rotor; i: front bearing; j: front bearing cover; k:after the bearing; l: after the bearing cap.
Remove cover, pumping rotor: demolition before the chassis and cover the joints (last mouth) are tagged in order to reset. Remove bearing cap and evenly cover the bearing cap bolts to win, and then screw the two bolts on the two items on the end cap screw holes, two bolts in the even forced to turn (to use the sling to cover the larger cover first hang up) won the cover. (No top screw holes, use a symmetrical copper beating, remove the cover, but to avoid too heavy percussion, to avoid damage to the cover) for a small electric DC Motor out of the rotor is carried by the man, in order to prevent uneven or forceful hand-touch sliding wound windings, the application board for the mat in the end winding.
Pulley or coupling of demolition: Demolition before or at the pulley end of shaft couplings make the anchor, with a special bit slowly with the position of pulley or coupling. Pull pulley or coupling to the attention of the force must make joint efforts along the axial direction, pull the end of a term shall not damage the rotor shaft center hole.
Bearing disassembly, cleaning: remove the bearing should be used to fit the special puller. Tension should focus on the bearing inner ring, outer ring can not pull, pull no damage to the rotor shaft with the top center hole (which can add some grease). Prior to demolition in the Orbit hydraulic motor bearings, bearings should be cleaned with a cleaning agent, check it for damage, whether the need for replacement.
网络文化经营许可证:浙网文[2013]0268-027号|增值电信业务经营许可证:浙B2-20080224-1 2007-2024 Tradevv.com. All rights reserved.